P2 — Ituri Province
Concession P2
Southern boundary concession with elevated terrain offering natural drainage advantages and strong geological indicators.
Key FactsOverview
Concession
P2
Type
Alluvial Gold
Ownership
100% BYM via COMIPED
Region
Ituri Province
Territory
Territory of Djugu
Altitude
880m
Latitude
00°53′55.9″N
Longitude
29°11′20″E
The southern boundary of the production corridor, Concession P2 features elevated terrain that provides natural drainage advantages critical for alluvial gold processing. Strong geological indicators from preliminary assessments suggest significant production potential when paired with semi-industrial equipment.