Financial assumptions.

The assumptions BYM plans against: what the equipment cost, what the sites are expected to produce, the gold price used, and what that implies for monthly revenue, costs and break-even. They are shown so that a conversation can start from the same numbers.

Planning assumptions, not results

The figures on this page are planning assumptions and projections prepared by BYM. They are not results and not forecasts. Financial statements and production reports are not published on this website; they are available on request. Actual outcomes depend on the gold price, grades, recoveries, operating conditions in the DRC and the availability of equipment and financing.

Read the full disclaimer

Key assumptions

The base case.

Base-case planning figures. Monthly values assume the daily target is met every operating day; the gold price is an assumption, not a realised price.
Capital expenditure (CAPEX)
US$1,060,600
Equipment and site set-up · planning figure
Target output — daily
400 g
Gold, base case
Target output — monthly
12,000 g
Gold, base case
Gold price assumption
US$95,000 / kg
Planning assumption
Monthly revenue
US$1,140,000
Projection at target output and assumed price
Monthly operating cost (OPEX)
US$171,500
Projection
Monthly net benefit
US$911,500
Revenue less operating cost · projection
Operating margin
80%
Projection, base case
Break-even output
302 g / day
Daily output at which revenue covers operating cost
Payback period
1.16 months
CAPEX ÷ monthly net benefit · projection
Annual ROI
1,032%
Projection, base case

Scenarios

Three production cases.

Monthly figures at three daily output levels, holding the gold price and operating cost constant. Operating cost is treated as fixed across the three cases.
Monthly revenue, operating cost and net profit at three daily production levels
ScenarioProduction / dayMonthly revenueMonthly OPEXMonthly net profit
Low case200 gUS$570,000US$171,500US$341,500
Base case400 gUS$1,140,000US$171,500US$911,500
High case600 gUS$1,710,000US$171,500US$1,481,500

Gold price US$95,000 per kg in all cases. Projections prepared by BYM; not audited.

Investment thesis

Why BYM believes the model works.

Six points, as BYM states them. They rest on the assumptions above and on the cooperative model described elsewhere on this site.
  1. 01

    Proven alluvial gold deposits across 4 contiguous licensed concessions

  2. 02

    Exceptionally low CAPEX ($1.06M) relative to production potential ($13.7M annual revenue)

  3. 03

    Operating margin of 80% with break-even at 60% of base case production

  4. 04

    Payback period of 1.16 months under base case scenario

  5. 05

    Structured governance framework attractive to institutional capital

  6. 06

    Multiple exit pathways including offtake, equity, and production-linked returns

The underlying workings — cost build-up, sensitivities and the limitations of each assumption — are shared on request after an introduction.

Planning assumptions, not results

The figures on this page are planning assumptions and projections prepared by BYM. They are not results and not forecasts. Financial statements and production reports are not published on this website; they are available on request. Actual outcomes depend on the gold price, grades, recoveries, operating conditions in the DRC and the availability of equipment and financing.

Read the full disclaimer

Next step

Discuss the assumptions with management.

Write to our corporate address with your questions on the figures above. We arrange a briefing call before sharing the underlying workings.